We continue working and delivering our Innovative, tailor-made & cost-effective water treatment solutions according to schedule!
The Imperative for Change
We continue working and delivering our Innovative, tailor-made & cost-effective water treatment solutions according to schedule!
A 2 x 96 m3/day Demineralized water plant for the Yerevan (Armenia) combined cycle power plant (CCPP), was successfully fabricated, tested, and shipped to our strategic client Siemens.All the major equipment was installed inside a single standard 40 ft. HC container and was pre-fabricated and fully tested at the GES workshop.
The unit was designed to be a rapidly deployable system, with minimum civil engineering required thereby reducing installation and commissioning time on site.
Despite harsh and unexpected global conditions, the project was done on a fast track taking less than 9 months from contract signing until the shipment of the Demineralized plant.
To better understand the process of building a water treatment plant, we made a short video that visualizes the process of building a WTP during the COVID 19 pandemic.
For any questions, inquiry or advice please do not hesitate to contact us.